Trail Repair Building Materials for "Area 4"

 

Description

Step 1 Materials Re-Route Trail and widen
Step 1 Materials None Required
   
Step 2 Materials Add 40 ' burrito, ditches and culverts
Step 2 Materials
50' of Geotextal Fabric (12' wide)
40' x 4' x 6" 3/4 Crushed Gravel = 3 yards
40' x 4' x 4" DG = 2 yards
18 - 2' 5/8" Rebar Stakes = 36'
40' x 2 Log Sides = 80' small logs
2 - 8 ' x 8" Pipe for culvert
 
* - formula for yards = volume / 27
   
Step 3 Materials Fill in Culvert
Step 3 Materials ~ 20 River rocks
   
Special Equipment Tractor for clearing trail and moving materials

Rounded Rectangle: Return to Area 4