Trail Repair Building Materials for "Phase 2"

 

 

Description

3/4" Crushed Gravel  
Area 1 100' x 4' x 6" 3/4 Crushed Gravel = 7.5 yards
Area 4 40' x 4' x 6" 3/4 Crushed Gravel = 3 yards
Total 10.5 yards
   
DG  
Area 1 100' x 4' x 4" DG = 5 yards
Area 4 40' x 4' x 4" DG = 2 yards
Total 7 yards
   
River Rocks  
Area 4 ~20 rocks
   
Geotextal Fabric  
Area 1 110'
Area 4   50'
Total 160'
   
Rebar Stakes  
Area 1 44 - 2' 5/8" Rebar Stakes = 88'
Area 4 18 - 2' 5/8" Rebar Stakes = 36'
Total 5/8" 124'
   
Log Sides  
Area 1 100' x 2 Log Sides = 200' small logs
Area 4   40' x 2 Log Sides = 80' small logs
Total 280'
   
Culvert for Drainage  
Area 1 1 - 8 ' x 8" Pipe
Area 2 2 - 8' Pipe plus 1 - 14 ' x 8" Pipe
Area 3 1 - 8' Pipe plus 2 - 14 ' x 8" Pipe
Area 4 2 - 8 ' x 8" Pipe for culvert
Total 90' x 8"
   
Special Equipment Trail Clearing and Ditch Digging Tractor

Rounded Rectangle: Return to Phase 2