Trail Repair Building Materials for "Phase 2"
|
|
Description |
| 3/4" Crushed Gravel | |
| Area 1 | 100' x 4' x 6" 3/4 Crushed Gravel = 7.5 yards |
| Area 4 | 40' x 4' x 6" 3/4 Crushed Gravel = 3 yards |
| Total | 10.5 yards |
| DG | |
| Area 1 | 100' x 4' x 4" DG = 5 yards |
| Area 4 | 40' x 4' x 4" DG = 2 yards |
| Total | 7 yards |
| River Rocks | |
| Area 4 | ~20 rocks |
| Geotextal Fabric | |
| Area 1 | 110' |
| Area 4 | 50' |
| Total | 160' |
| Rebar Stakes | |
| Area 1 | 44 - 2' 5/8" Rebar Stakes = 88' |
| Area 4 | 18 - 2' 5/8" Rebar Stakes = 36' |
| Total | 5/8" 124' |
| Log Sides | |
| Area 1 | 100' x 2 Log Sides = 200' small logs |
| Area 4 | 40' x 2 Log Sides = 80' small logs |
| Total | 280' |
| Culvert for Drainage | |
| Area 1 | 1 - 8 ' x 8" Pipe |
| Area 2 | 2 - 8' Pipe plus 1 - 14 ' x 8" Pipe |
| Area 3 | 1 - 8' Pipe plus 2 - 14 ' x 8" Pipe |
| Area 4 | 2 - 8 ' x 8" Pipe for culvert |
| Total | 90' x 8" |
| Special Equipment | Trail Clearing and Ditch Digging Tractor |
![]()